According to the National Audit Office, 14 outages related to units 02 and 03 of the Lakwijaya Power Plant have occurred in the last year (2021).
The total volume of energy lost to the national grid due to this has been calculated at 663,510 megawatt hours.
The audit has revealed that although seven years have elapsed since the operation of units 02 and 03 in one of the Lakwijaya power plants, level A maintenance work has not been carried out so far.
According to the audit report, the level A maintenance period should be i from 4 to 6 years.