Tuesday, July 14, 2026
Lanka Sara
  • සිංහලසිංහල
  • News
  • Politics
  • Social
  • Sci & Tech
  • Life
    • Travel
  • Arts
  • Sports
  • Biz & Economy
  • About Us
No Result
View All Result
Lanka Sara
  • News
  • Politics
  • Social
  • Sci & Tech
  • Life
    • Travel
  • Arts
  • Sports
  • Biz & Economy
  • About Us
  • සිංහලසිංහල
Lanka Sara
No Result
View All Result
Home News

20 MW of installed roof top solar systems await for final approval!

by Lanka Sara Editor
February 2, 2022
in News
Share on FacebookShare on Twitter

There are around 20 MW of solar systems have been already installed in rooftops which are pending fo approval process and if the approval process get fast tracked these power can be added to the national grid within few days Kushan Jayasuriya, President of the Solar Energy Industry Association, said .

A number of rooftop solar panels are currently in the final stages of approval to be connected to the national grid after completing all the technical specifications. He stated that it is possible when Lankasara inquired about this.
Kushan Jayasuriya further stated that this would be a step towards providing some relief to the national grid in the face of the current severe energy crisis.
Speaking further the President of the Solar Energy Industries Association said, “At present, solar power units installed on the roofs of the country provide 480 megawatts of electricity to the national grid. In addition, ground-mounted solar panels provide a capacity of about 100 megawatts. But in the last two years or so, no significant progress has been made with regard to solar energy. If steps were taken in this regard, renewable energy would have been able to add a higher percentage to our national grid. But we do not know the reason. Nothing progressive has happened in the last two years. ”
Many solar panels on the roofs where all construction work has been completed have not been connected to the national grid due to non-completion of the approval process. This is mostly due to issues regarding the coordination between the various divisions within the Ceylon Electricity Board. At the moment of this crisis, if we expedite this process further, we will be able to add them to the national grid very soon, ”said Jayasuriya.

RelatedPosts

AG Seeks Supreme Court Ruling on Gotabaya’s Bid to Block Arrest

Inside the Negombo Prison Clash That Claimed 26 Lives

Death Toll Rises to 25 After Violent Clash at Negombo Prison

Tags: Latest
Share69Tweet43
Previous Post

Rising Covid halts 13 trains for today

Next Post

An external attack to Ragama Medical students!

Related Posts

News

Kandy Esala Perahera to Begin with Kap Planting on August 13

July 8, 2026
News

Negombo Court Under Serious Threat, CID Warns

July 7, 2026 - Updated on July 8, 2026
News

AG Seeks Supreme Court Ruling on Gotabaya’s Bid to Block Arrest

July 6, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

No Result
View All Result
ADVERTISEMENT

Kandy Esala Perahera to Begin with Kap Planting on August 13

July 8, 2026

Negombo Court Under Serious Threat, CID Warns

July 7, 2026 - Updated on July 8, 2026

AG Seeks Supreme Court Ruling on Gotabaya’s Bid to Block Arrest

July 6, 2026
    Facebook Twitter Youtube Whatsapp Telegram RSS
    Lanka Sara

    Recent News

    • Kandy Esala Perahera to Begin with Kap Planting on August 13
    • Negombo Court Under Serious Threat, CID Warns
    • AG Seeks Supreme Court Ruling on Gotabaya’s Bid to Block Arrest

    Category

    • Arts
    • Biz & Economy
    • Culture
    • Environment
    • Health
    • Life
    • LPL
    • News
    • Politics
    • Presidential Election 2024
    • Sci & Tech
    • Social
    • Sports
    • Throwback
    • Travel

    © 2020 - 2026 Lankasara.com.

    No Result
    View All Result
    • Home
    • Politics
    • Biz & Economy
    • Sports
    • Life
    • Sci & Tech
    • සිංහල

    © 2020 - 2026 Lankasara.com.